![]() ![]() Later in the morning, NASA also officials spotted what they feared was a crack or some other defect on the core stage - the big orange fuel tank with four main engines on it - but they later said it appeared to be just a buildup of frost in a crevice of the insulating foam. The problems seen Monday were reminiscent of NASA’s space shuttle era, when hydrogen fuel leaks disrupted countdowns and delayed a string of launches back in 1990. A two-person lunar landing could follow by the end of 2025. Vice President Kamala Harris and Apollo 10 astronaut Tom Stafford were among the VIPs who arrived.Īssuming the shakedown flight goes well, astronauts will climb aboard for the second Artemis mission and fly around the moon and back as soon as 2024. We’re going to play all nine innings here.”Įven though no one was on board, thousands of people jammed the coast to see the rocket soar. The dummies inside the Orion capsule were fitted with sensors to measure vibration, cosmic radiation and other conditions during the shakedown flight, meant to stress-test the spacecraft and push it to its limits in ways that would never be attempted if humans were aboard.Īsked about the possibility of another launch attempt on Friday, Sarafin said, “We really need time to look at all the information, all the data. The 322-foot (98-meter) spaceship is the most powerful rocket ever built by NASA, out-muscling even the Saturn V that took the Apollo astronauts to the moon. The six-week mission was scheduled to end with the capsule returning to Earth in a splashdown in the Pacific in October. The rocket was set to lift off on a flight to propel a crew capsule into orbit around the moon. Referring to launch delays, he said: “It’s just part of the space business and it’s part of, particularly, a test flight.” “This is a very complicated machine, a very complicated system, and all those things have to work, and you don’t want to light the candle until it’s ready to go,” said NASA Administrator Bill Nelson. ![]() Mission manager Mike Sarafin said the fault did not appear to be with the engine itself but with the plumbing leading to it.Ĭomplicating matters, as engineers were trying to troubleshoot that problem on the launch pad, yet another hydrogen leak developed, this one involving a vent valve higher up on the rocket, Sarafin said. Engineers struggled to pinpoint the source of the problem well after the launch postponement was announced. Then, NASA ran into new trouble when it was unable to properly chill one of the rocket’s four main engines, officials said. Photo: ASSOCIATED PRESS/John Raoux Previous Next 3 after NASA's two-day launch delay for Artemis 1.Michael Sarafin, center, Artemis Mission Manager, answers questions during a new conference about the status of the NASA moon rocket for the Artemis 1 mission to orbit the Moon as NASA Administrator Bill Nelson, left, and James Free, right, associate administrator for the Exploration Systems Development listen at the Kennedy Space Center, Monday, Aug. ![]() Our review of the Oculus Quest 2 gave it a near-perfect 4.5 stars, making it our favorite headset right now.Įditor's note: This story has been updated with Felix & Paul's broadcast plans for "Artemis Ascending" on Sept. If you're looking to get into virtual reality, consult our best VR headset guide for immersive gaming, virtual cinema experiences or interactive workouts. Originals from the studio include the "Space Explorers" series, productions with franchises like "Jurassic World" and comedy specials for "Just for Laughs" starring Trevor Noah, Lilly Singh and other celebrities.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |